Dear I&AP
The Cape Town Cycle Tour takes place on Sunday 11th March 2018 and makes use of this construction site as part of the route. On Kommetjie Road near the Capri Drive intersection the existing traffic deviation is to have a portion of its gravel surface replaced with asphalt to improve the safety of the cyclists through the deviation. For this material to be placed, an off peak stop go system will be instituted on Thursday 8th March 2018 from 09:00 through to 15:00.
The necessary advance warning and temporary signage will be put in place to ensure the safety of both the motorist and the work force.
The unfortunate accident that occurred on site last week has resulted in a large portion of the construction site being placed under a construction embargo. This has prevented the pipe crossing at this deviation from being completed and the road surface being reinstated.
Regards,
Kommetjie Road project team.
Chand Environmental Consultants
Suite 1.2 A
Richmond Centre
174 – 206 Main Road
Plumstead
7800
Tel: (021) 762-3050
Website: www.chand.co.za